Induction Melting Brass
Induction Melting Brass with Zinc-Loss Control
Quick Answer
Induction melting brass melts the copper-zinc charge with eddy currents from a water-cooled coil fed by a medium-frequency IGBT power supply. The electromagnetic field also stirs the bath, which keeps the zinc evenly distributed.
Brass melts at about 885–955 °C, depending on grade. Zinc boils at 907 °C, so zinc loss is the main process risk. To control it:
- Hold the melt at 950–1,020 °C, and never above 1,050 °C.
- Keep holding time short.
- Add zinc last.
- Keep a flux cover on the melt.
- Run fume extraction throughout the heat.
- Use a silica lining (SiO₂ ≥ 97%).

What is Induction Melting Brass?
Induction melting brass is the melting of copper-zinc alloys in a coreless induction furnace. A medium-frequency generator, compensating capacitors and the furnace body make up the system. An infrared temperature sensor and controller can be added.
The furnace can be a tilting, push-up or stationary type. Tilting furnaces are tilted manually, electrically or hydraulically. Stirring helps flux and oxides float to the surface, which gives cleaner castings.
For pure copper, see induction melting copper.

Key Applications

| Application | Alloys | Capacity | Key requirement |
|---|---|---|---|
| Brass valve and fitting production | C36000, C28000, C37700 | 200–1,000 kg | Zinc-loss control, fast cycle, consistent chemistry |
| Small brass foundry | C26000, C36000 | 100–300 kg | Zinc-loss control; fume extraction |
| Medium brass / bronze foundry | C28000, C90500 | 300–1,000 kg | Hydraulic tilt; PLC control; batch production |
| Laboratory and small casting | All copper alloys | 5–100 kg | Flexible alloy switching |
| Brass scrap recycling | Sorted brass scrap | By project | Sorting and drying; zinc recovery by vacuum distillation |
To recover zinc and copper separately from brass scrap, see the copper zinc separation furnace.

Suitable Materials
| Grade | Name | Melting range | Density | Recommended lining | Special handling |
|---|---|---|---|---|---|
| C26000 | Cartridge brass 70/30 | 915–955 °C | 8.53 kg/dm³ | Silica (SiO₂ ≥ 97%) | Zinc fuming; fume extraction required |
| C28000 | Muntz metal 60/40 | 900–940 °C | 8.39 kg/dm³ | Silica | Higher zinc loss; temperature control critical |
| C36000 | Free-cutting brass | 885–900 °C | 8.50 kg/dm³ | Silica or alumina-silica | Lead content; ventilation required |
| Brass returns and scrap | Sorted by alloy | Varies | Bulk 2–5 kg/dm³ | Match to the dominant alloy | Pre-sort, pre-dry, manage dross |
The same furnaces also melt copper, bronze, silver, gold, aluminum and steel, with the lining and frequency chosen for each metal.
Working Principle

- Power: The IGBT inverter converts 3-phase mains into 1–20 kHz current.
- Resonance: The coil and compensating capacitors form a resonant circuit.
- Heating: The coil’s alternating field induces eddy currents in the brass charge, and Joule heating melts it.
- Stirring: Electromagnetic stirring distributes the zinc evenly, so it does not segregate.
- Zinc control: Zinc boils at 907 °C, so temperature and holding time decide how much zinc is lost.
Background: how an induction heater works.
Silica lining for brass
| Item | HLQ data |
|---|---|
| Lining type | Silica (acid), SiO₂ ≥ 97% |
| Sintering temperature | 1,050–1,100 °C |
| Expected life | 200–400 heats |
| Primary failure mode | Thermal cycling erosion |
| Alloy switching | Do not melt pure copper in a lining used for brass; zinc in the lining can contaminate the copper |
Technical Specifications
| Parameter | DW-MF medium-frequency melting system |
|---|---|
| Power range | 15–160 kW maximum input (DW-MF-15 to DW-MF-160) |
| Frequency | 1–20 kHz; typical 4, 8, 11, 15 or 20 kHz depending on application |
| Supply | 3 × 380 V ±20%, 50 or 60 Hz |
| Duty cycle | 100%, 24-hour operation |
| Melting capacity range | 3–500 kg |
| Melt time | About 50–60 min from a cold furnace; 20–30 min in a hot furnace |
| System | MF generator, compensating capacitors, melting furnace; optional infrared sensor and temperature controller |
| Furnace types | Tilting (manual, electrical, hydraulic), push-up, stationary |
| Brass melt temperature | 950–1,020 °C recommended; never above 1,050 °C |
| Lining | Silica, SiO₂ ≥ 97% |

Recommended Model Selection
| Application | Alloys | Capacity | Power | Frequency | Key feature |
|---|---|---|---|---|---|
| Laboratory / small casting | All copper alloys | 5–100 kg | 15–75 kW | 2,000–8,000 Hz | Compact; tilt pour |
| Small brass foundry | C26000, C36000 | 100–300 kg | 75–200 kW | 1,000–2,500 Hz | Zinc-loss control; fume extraction |
| Medium brass / bronze foundry | C28000, C90500 | 300–1,000 kg | 200–700 kW | 500–1,500 Hz | Hydraulic tilt; PLC control |
DW-MF power supplies
| Model | DW-MF-15 | DW-MF-25 | DW-MF-35 | DW-MF-45 | DW-MF-70 | DW-MF-90 | DW-MF-110 | DW-MF-160 |
|---|---|---|---|---|---|---|---|---|
| Max input power | 15 kW | 25 kW | 35 kW | 45 kW | 70 kW | 90 kW | 110 kW | 160 kW |
| Weight | 50 kg | 50 kg | 65 kg | 70 kg | 80 kg | 94 kg | 114 kg | 145 kg |
Details: medium frequency induction melting furnace for copper and brass. For 100–1,000 kg brass and bronze, see the induction copper and brass melter.
Process Workflow

| Step | Action | Control point |
|---|---|---|
| 1 | Inspect the lining and cooling water; start fume extraction | Extraction running throughout the heat |
| 2 | Preheat the lining or crucible | Avoid thermal shock |
| 3 | Sort the charge by alloy, weigh it and pre-dry the scrap | No wet scrap in a hot furnace |
| 4 | Load dense material first | — |
| 5 | Raise power gradually | — |
| 6 | Add the remaining charge as the first batch melts | — |
| 7 | Apply a flux cover (charcoal or copper flux) | Keep the cover on during the heat |
| 8 | Add zinc as the last element | Limits zinc loss |
| 9 | Hold at 950–1,020 °C | Never above 1,050 °C; short holding |
| 10 | Skim the dross | Clean surface before pouring |
| 11 | Check the temperature and take a sample | Cu-Zn composition |
| 12 | Tilt and pour into a ladle or moulds | — |
Workshop layout

Common Problems and Solutions
| Problem | Likely cause | Solution |
|---|---|---|
| Zinc fuming | Temperature above 1,050 °C; long holding | Reduce to 950–1,000 °C; minimize holding; add zinc last; check fume extraction |
| Hydrogen porosity in castings | Wet or oily scrap; damp flux | Pre-dry all scrap and flux; purge with dry argon |
| Rapid lining erosion | Wrong lining chemistry, overheating, poor sintering, thermal shock | Use a silica lining; follow the sintering protocol; preheat the charge |
| Alloy out of specification | Charge error, volatile zinc loss, contaminated scrap | Recalculate the charge; add volatile elements last; use certified scrap |
| Inconsistent chemistry between heats | Variable scrap, manual addition errors, sampling | Sort scrap; standardize sampling |
| Pure copper contaminated after brass | Zinc absorbed in the lining | Use a dedicated lining or furnace for each alloy family |
| Furnace fails to start | Coil insulation fault, water flow alarm, IGBT or capacitor fault | Check coil insulation (> 1 MΩ), water flow, IGBT and capacitor fuses |
Engineering Selection Guide
| Factor | What to confirm | Recommendation |
|---|---|---|
| Brass grade | C26000, C28000, C36000 or other | Sets the melt temperature and ventilation needs (lead in C36000) |
| Throughput | Net kg/h with a 70% utilization factor | Sets furnace capacity and power |
| Charge form | Ingot, returns or scrap | Scrap must be sorted and dried |
| Lining | Dedicated to brass or shared with other alloys | Silica; keep a separate lining for pure copper |
| Fume extraction | Hood above the furnace | Required for zinc and lead fumes |
| Pouring | Manual, electrical or hydraulic tilt | Hydraulic for larger batches; see the hydraulic tilting copper melting furnace |
| Scale-up | Future capacity | The 5–5000 kg copper melting induction furnace range covers brass up to industrial size |
Advantages and Limitations
| Advantages | Limitations |
|---|---|
| Electromagnetic stirring distributes zinc evenly | Zinc fuming needs dedicated fume extraction |
| Precise power control helps hold 950–1,020 °C | The temperature window must be held to limit zinc loss |
| Stirring helps flux and oxides float, for cleaner castings | A lining used for brass should not be used for pure copper |
| About 20–30 min per melt in a hot furnace | Lead-bearing brass needs ventilation |
| One furnace also melts copper, bronze, silver, gold and aluminum | Cooling water is required |
Why Choose HLQ?
| Strength | What it means |
|---|---|
| DW-MF series | 15–160 kW, 1–20 kHz, 100% duty cycle |
| Brass process practice | Temperature window, zinc added last, flux cover, fume extraction |
| Silica linings | Selected and sintered for brass |
| Furnace options | Tilting (manual, electrical, hydraulic), push-up or stationary |
| Scale-up path | Copper-alloy furnaces from 5 kg to 5,000 kg |
| Zinc recovery | Copper-zinc vacuum separation furnaces for brass scrap |
10 Core FAQs
1. At what temperature does brass melt?
C26000 at 915–955 °C, C28000 at 900–940 °C and C36000 at 885–900 °C.
2. What temperature should the melt be held at?
About 950–1,020 °C for most brass alloys, and never above 1,050 °C.
3. Why does brass lose zinc during melting?
Zinc boils at 907 °C, so it fumes at brass melting temperatures. Overheating and long holding make the loss worse.
4. How do I reduce zinc loss?
Control the temperature, minimize holding time, add zinc last, keep a flux cover and run fume extraction.
5. Which lining should I use?
Silica with SiO₂ ≥ 97%, sintered at 1,050–1,100 °C. Expect about 200–400 heats.
6. Can I melt pure copper after brass in the same furnace?
Not in the same lining. Zinc absorbed in the lining can contaminate the copper, so use a dedicated lining or crucible.
7. Which power supply is used?
DW-MF medium-frequency IGBT supplies, 15–160 kW at 1–20 kHz, 3 × 380 V, 100% duty cycle.
8. How long does one melt take?
About 50–60 minutes from a cold furnace and 20–30 minutes in a hot furnace.
9. What power does a brass foundry need?
75–200 kW at 1–2.5 kHz for 100–300 kg, and 200–700 kW at 0.5–1.5 kHz for 300–1,000 kg.
10. Is lead-bearing brass a problem?
Free-cutting brass C36000 contains lead, so ventilation is required.