Aluminum Recycling Melting Furnace
Aluminum Recycling Melting Furnace — HLQ SMJD Series
Quick Answer
An aluminum recycling melting furnace remelts approved aluminum scrap, ingots and prepared can material into molten aluminum or aluminum alloy for subsequent processing. The HLQ SMJD product listing contains configurations with source-listed power values of 60–200 kW and listed aluminum capacities of 150–1200 kg.
The published capacity figures are expressed in kilograms. They do not establish hourly production rates, melting times, metal recovery or energy consumption. Furnace selection must also consider alloy composition, charge condition, required melt quality and the complete operating cycle.
What is the Aluminum Recycling Melting Furnace?
The HLQ SMJD aluminum recycling melting furnace is an electrically powered induction melting system for the remelting stage of aluminum recycling. It combines a power supply, furnace assembly, crucible arrangement and temperature-control functions.
The product page identifies aluminum scrap, aluminum alloys, ingots and cans among its intended materials. Feed preparation, alloy control, emissions handling, melt treatment and casting must be defined around the selected furnace configuration.
This product belongs to the HLQ aluminum melting furnace range. The final equipment specification should identify the exact model, power rating, crucible, electrical requirements and transfer arrangement.

Key Applications
The furnace is evaluated as the melting stage within a defined aluminum recycling or remelting process. The original page supports the following application areas without establishing customer-specific production results.
| Application | Feedstock | Engineering consideration |
|---|---|---|
| Production scrap remelting | Sorted aluminum returns and compatible scrap | Confirm alloy identity, contamination, charge dimensions and required melt quality. |
| Aluminum ingot remelting | Known-composition aluminum or aluminum alloy ingots | Check ingot dimensions against the crucible opening and approved charging method. |
| Prepared can remelting | Accepted aluminum can feed | Evaluate coatings, contamination, charge preparation and the required emissions-control arrangements. |
| Metal preparation for casting | Approved aluminum charge | Define melt treatment, transfer, molds and output inspection requirements. |
Related equipment is described on the aluminum scrap melting furnace page. Configuration and capacity should be checked against the documentation for the actual supplied system.

Suitable Materials
Material suitability depends on the metallic aluminum content, alloy composition, physical form and contamination level of the charge. A material name alone does not establish melting yield or suitability for a particular operating procedure.
| Material | Source-page status | Required assessment |
|---|---|---|
| Aluminum ingots | Listed | Confirm composition, dimensions and dry condition before charging. |
| Aluminum alloy scrap | Listed | Separate incompatible alloys and assess coatings, oils and nonmetallic contamination. |
| Aluminum cans | Listed | Establish a suitable preparation and charging procedure for the actual can feed. |
| Aluminum dross or slag | Named in the source listing | Metal content and recovery route require a separate assessment. No recovery percentage is established by the published furnace table. |
| Mixed or unidentified scrap | No universal acceptance criteria provided | Characterize and prepare the feed before approving a melting process. |
Only feed accepted under the site’s charging procedure should enter the furnace. Moisture, sealed containers and unsuitable contaminants must be controlled before contact with molten metal.
Working Principle
Induction heating uses alternating electrical current in a coil to create a changing magnetic field. Electrical resistance losses in a coupled conductive component generate heat.
The original SMJD manual describes a conductive-crucible heating route: induced currents heat the crucible, and heat transfers from the crucible to the aluminum charge. The actual coil, crucible material and heating arrangement should be confirmed for the supplied configuration.
- Electrical conversion: the power electronics provide alternating current for the induction coil.
- Electromagnetic coupling: the coil produces a changing magnetic field around the conductive heating assembly.
- Heat generation and transfer: the manual-described crucible transfers heat to the aluminum charge.
- Temperature control: temperature measurement and the configured controller regulate the heating process.
- Melt handling: the approved transfer arrangement moves the molten metal to the next process stage.
The induction heating principle provides background on electromagnetic heating. Frequency, coil construction, crucible properties and loading conditions must be matched to the equipment.

Technical Specifications
Published Model and Capacity Data
The following table preserves the original multi-material capacity records and adds the input-current values from the linked SMJD parameter document. These are source-listed figures, not independently verified test results.
| Model | Listed power | Steel / stainless steel column | Copper / gold / silver column | Aluminum column | Listed input current |
|---|---|---|---|---|---|
| SMJD-463 | 60 kW | 200 kg | 500 kg | 200 kg | 90 A |
| SMJD-480 | 60 kW | 150 kg | 500 kg | 150 kg | 90 A |
| SMJD-580 | 80 kW | 200 kg | 600 kg | 200 kg | 120 A |
| SMJD-600 | 60 kW | 230 kg | 560 kg | 230 kg | 90 A |
| SMJD-900 | 120 kW | 300 kg | 900 kg | 300 kg | 180 A |
| SMJD-905 | 80 kW | 300 kg | 900 kg | 300 kg | 120 A |
| SMJD-1250 — first source entry | 80 kW | 400 kg | 1200 kg | 400 kg | 120 A |
| SMJD-1250 — second source entry | 120 kW | 450 kg | 1350 kg | 450 kg | 180 A |
| SMJD-1500 | 120 kW | 500 kg | 1500 kg | 500 kg | 180 A |
| SMJD-1550 | 120 kW | 520 kg | 1560 kg | 520 kg | 180 A |
| SMJD-1700 | 160 kW | 600 kg | 1700 kg | 600 kg | 240 A |
| SMJD-2300 | 160 kW | 800 kg | 2000 kg | 800 kg | 240 A |
| SMJD-3100 | 200 kW | 1200 kg | 3000 kg | 1200 kg | 300 A |
The original document groups several metals in the same capacity column. These grouped figures do not establish identical usable capacity or suitability for every named metal. The aluminum column is the relevant starting reference for this product.
The two SMJD-1250 entries retain their original model labels. Their final configuration identifiers require confirmation. Capacity figures are in kg, with no stated melting time or hourly output basis.
Shared Parameters and Documentation Limits
| Parameter | Published information | Engineering interpretation |
|---|---|---|
| Electrical supply | Three-phase 380 V, 50–60 Hz in the parameter PDF | Confirm the actual supply arrangement and final electrical drawings. |
| Frequency | 1–100 kHz, customized according to the document | This is a stated customization range, not proof that each model continuously covers the full range. |
| Power terminology | The capacity table says input power; the electrical table says output power for the same values. | Confirm the rating definition before electrical or energy calculations. |
| Maximum temperature | 1800°C in the original multi-metal table | Not an aluminum melting or holding setpoint. Confirm the selected furnace and crucible ratings. |
| Temperature control | PID control and a digital temperature controller are described. | Sensor type, location, calibration and acceptance method require configuration details. |
| Accuracy claim | The page mentions 3°C. | The measurement basis and operating conditions are unspecified; this is not a verified whole-melt uniformity guarantee. |
| Operating duty | 100% duty and 24-hour operation are claimed. | Confirm permitted continuous duty together with cooling, maintenance and operating conditions. |
| Protection functions | Overvoltage, undervoltage, phase-loss, overcurrent and overtemperature protection are described. | Check the actual protection functions and interlocks in the supplied system. |
Input-current figures must be verified against the final nameplate and electrical documents. They should not be used alone to select cables, protective devices or supply capacity.
Crucible Dimensions from the Original Parameter Document
The linked parameter PDF provides the following crucible dimensions. Dimensions are in millimetres. Its stated tolerances are A ±10 mm, B ±5 mm, C ±10 mm and H ±10 mm.
| Model | Crucible reference | A: upper outer diameter | B: upper inner diameter | C: bottom outer diameter | H: total height |
|---|---|---|---|---|---|
| SMJD-463 | 463# | 565 | 500 | 310 | 617 |
| SMJD-480 | 480# | 510 | 420 | 400 | 710 |
| SMJD-580 | 580# | 420 | 360 | 300 | 840 |
| SMJD-600 | 600# | 620 | 525 | 620 | 470 |
| SMJD-900 | 900# | 520 | 425 | 510 | 960 |
| SMJD-905 | 905# | 620 | 530 | 620 | 650 |
| SMJD-1250 | 1250# | 620 | 535 | 620 | 850 |
| SMJD-1500 | 1500# | 735 | 640 | 460 | 900 |
| SMJD-1550 | 1550# | 775 | 682 | 400 | 750 |
| SMJD-1700 | 1700# | 610 | 500 | 610 | 1200 |
| SMJD-2300 | 2300# | 880 | 775 | 355 | 1000 |
| SMJD-3100 | 3100# | 780 | 645 | 780 | 1400 |
These are crucible dimensions, not complete furnace footprints. The document provides one SMJD-1250 crucible entry and does not separately identify the two power configurations in this dimensions table.
Original Technical Documents
- SMJD induction melting furnace parameters
- Original aluminum, copper and iron induction melting furnace manual
- Aluminium scraps recycling melting process: background reading
The recycling-process document is background research. It should not be treated as a performance test of the SMJD furnace.
Recommended Model Selection
Use the listed aluminum capacity to identify candidates, then verify charge form, required cycle time, alloy, usable working capacity and site conditions. Models with similar listed capacity can have different listed power values.
| Source-listed aluminum capacity | Candidate configurations | Important comparison |
|---|---|---|
| 150–230 kg | SMJD-480, SMJD-463, SMJD-580, SMJD-600 | Compare crucible dimensions, feed dimensions and the 60 or 80 kW source-listed power values. |
| 300 kg | SMJD-905 and SMJD-900 | Both list 300 kg aluminum capacity, with 80 and 120 kW respectively. No comparative melting-time test is supplied. |
| 400–520 kg | Both SMJD-1250 entries, SMJD-1500 and SMJD-1550 | Resolve the repeated SMJD-1250 identifier and confirm the exact ordered configuration. |
| 600–1200 kg | SMJD-1700, SMJD-2300 and SMJD-3100 | Verify handling, transfer, electrical demand, working capacity and the required complete cycle. |
A capacity figure does not determine melt time. A higher listed power value also does not establish a production rate without a defined charge, temperature cycle and operating test.
Process Workflow
| Stage | Process task | Verification point |
|---|---|---|
| 1. Identify feedstock | Classify alloy, scrap source and charge form. | Confirm the intended composition and acceptance criteria. |
| 2. Prepare the charge | Sort and prepare material under the site’s approved procedure. | Verify dry condition and control unsuitable contamination. |
| 3. Melt under control | Operate the furnace using the approved charging and temperature procedure. | Monitor temperature, equipment condition and applicable interlocks. |
| 4. Verify melt quality | Manage dross and complete any required melt treatment. | Check composition and quality against the output specification. |
| 5. Transfer the melt | Use the configured pouring or transfer arrangement. | Confirm receiving equipment and handling conditions. |
| 6. Cast and inspect | Cast or transfer the metal for subsequent processing. | Record output mass and the required inspection results. |


Common Problems and Solutions
The following checks are engineering review points rather than diagnoses of a particular installation. Inspection and maintenance should follow the supplied equipment documentation.
| Observed problem | Factors to investigate | Recommended response |
|---|---|---|
| Longer melting cycle | Charge form, initial condition, loading practice, delivered power and heat losses. | Compare actual operating records with a defined reference charge and cycle. |
| Excessive dross or low metal yield | Feed contamination, coatings, oxidation exposure and holding practice. | Review feed preparation and melt treatment; measure the input and recovered-metal masses. |
| Unstable temperature indication | Sensor condition, position, calibration and signal connection. | Check the measurement system using the approved verification method. |
| Electrical or temperature alarm | Supply condition, load, component condition and configured service systems. | Follow the fault procedure and investigate the cause before restarting. |
| Output composition outside specification | Mixed alloys, contamination or incomplete melt treatment. | Review feed segregation, composition testing and the required treatment route. |
| Crucible damage or leakage concern | Crucible condition, installation and thermal or mechanical loading. | Stop operation and follow the equipment inspection and replacement procedure. |
Engineering Selection Guide
Define the Required Process
| Selection input | Information to establish | Why it matters |
|---|---|---|
| Material | Alloy, metallic content, contamination and charge form. | Influences melting behavior, treatment requirements and recovered-metal quality. |
| Working load | Required usable melt mass and the actual charging method. | Connects the production requirement to furnace and crucible selection. |
| Temperature cycle | Initial condition, melt target, holding requirements and transfer temperature. | Defines the thermal duty without relying on a generic maximum-temperature claim. |
| Production cycle | Charging, melting, treatment, transfer and turnaround times. | Determines practical output beyond the nominal capacity in kg. |
| Electrical supply | Actual supply, final input rating and protection requirements. | Allows electrical design using confirmed equipment data. |
| Site arrangement | Furnace footprint, utilities, extraction, handling routes and maintenance access. | Requires a model-specific installation drawing rather than a crucible-size table. |
Measure Capacity, Productivity and Yield Separately
- Capacity: the usable metal mass established for the selected furnace configuration.
- Productivity: accepted output mass divided by the complete measured production time.
- Metal yield: recovered metal mass divided by the defined charge mass.
- Specific electrical consumption: measured electricity divided by the clearly defined output mass.
Each comparison should state whether it includes preparation, holding, transfer and auxiliary equipment. This avoids treating unlike operating conditions as equivalent.
The broader induction melting furnace range can be reviewed where a different material, operating duty or furnace arrangement is required.
Advantages and Limitations
| Feature | Potential value | Limitation or verification need |
|---|---|---|
| Electric induction heating | Provides electrically controlled heat for the melting stage. | Energy consumption must be measured for the actual charge and operating cycle. |
| Multiple listed SMJD configurations | Supports preliminary comparison across different listed aluminum capacities. | Published capacity does not establish throughput, yield or melting time. |
| Described temperature-control functions | Support regulation of the melting process. | Accuracy depends on the supplied sensors, installation, calibration and operating conditions. |
| Listed protection functions | Provide a basis for reviewing equipment fault monitoring. | The actual interlocks and protective arrangements must be checked on the supplied system. |
| Crucible-based arrangement | Provides a documented starting point for charge-access and crucible-size assessment. | Crucible suitability, condition, usable fill and service life require operating review. |
Electrical heating does not eliminate emissions from contaminated feed or the need to manage dross. Melting also does not automatically remove alloying elements or produce pure aluminum.
Why Choose HLQ?
HLQ provides an SMJD product listing with model-by-model capacity records and linked technical documents. These provide a starting point for a documented engineering comparison.
- Published model records: aluminum capacities and power values are available for preliminary screening.
- Additional technical documentation: the parameter file provides electrical data and crucible dimensions.
- Process features: temperature control, power regulation and protective functions are described in the product information.
- Configuration review: model identity, electrical ratings, crucible and transfer arrangement can be defined in the final technical specification.
The advantages of induction heating should be evaluated against the actual charge and operating requirements. The final specification should resolve differences between the original capacity table, electrical table and selected configuration.
Further product information is available through HLQ induction heating equipment.

6 Core FAQs
1. What does an aluminum recycling melting furnace do?
It remelts approved aluminum-containing charge into molten aluminum or aluminum alloy. Feed preparation, melt treatment and casting are additional process stages that must be defined for the application.
2. What aluminum capacities are listed for the SMJD range?
The original model table lists aluminum capacities from 150 to 1200 kg. These values are not hourly production rates. Usable working capacity and operating cycle require model-specific confirmation.
3. Why are there two SMJD-1250 entries?
The source lists SMJD-1250 at 80 kW with 400 kg aluminum capacity and again at 120 kW with 450 kg capacity. Both entries are preserved because the source does not provide separate configuration identifiers.
4. Can the furnace melt cans and aluminum dross?
Cans and dross are named in the source listing. Prepared can feed requires an appropriate charging and emissions-control procedure. Dross requires a separate assessment of metallic content and recovery method; the source does not establish a recovery percentage.
5. Does the listed 1800°C maximum define the aluminum operating temperature?
No. That figure appears in a multi-metal equipment table. The aluminum melting and holding procedure must follow the alloy requirements and the confirmed ratings of the selected furnace and crucible.
6. How should melting time, energy consumption and output be confirmed?
Use a defined charge and record the complete operating cycle, accepted metal output and measured electricity. The test should identify starting conditions, temperature targets, holding, transfer and auxiliary loads so that comparisons use the same basis.















