Iron Melting Crucible Furnace

Iron Melting Crucible Furnace

Quick Answer

The HLQ iron melting crucible furnace is described as a medium-frequency induction system for melting iron and other specified metals. Its published GW table lists 12 models with nominal capacities of 0.35–30 t, rated powers of 250–15000 kW and frequencies of 0.25–1 kHz.

For iron foundries, selection starts with charge identity, the approved metal-containment system, useful tapped mass and the complete heat cycle. The page does not identify a crucible material or confirm a removable crucible, so those details must be established for the selected configuration.

Table of Contents

  1. Quick Answer
  2. What is the Iron Melting Crucible Furnace?
  3. Key Applications
  4. Suitable Materials
  5. Working Principle
  6. Technical Specifications
  7. Recommended Model Selection
  8. Process Workflow
  9. Common Problems and Solutions
  10. Engineering Selection Guide
  11. Advantages and Limitations
  12. Why Choose HLQ?
  13. 6 Core FAQs

What is the Iron Melting Crucible Furnace?

This product combines a medium-frequency power supply, capacitor cabinet, furnace body, tilting equipment and water-cooled cables. The main description specifies a steel-shell furnace with hydraulic tilting; the configuration note also includes aluminum-shell and reducer-based alternatives.

The word “crucible” identifies the metal-containing vessel in the product name, but the page does not specify its material, construction method or removal arrangement. Do not infer a graphite pot, silicon-carbide vessel or a particular refractory recipe from the name alone.

Documented product information and details requiring confirmation
Area Published information Confirm for the selected furnace
Heating system Medium-frequency induction equipment Matched converter, coil and capacitor arrangement
Metal containment Crucible furnace product designation Vessel or lining material, construction, working fill and inspection limits
Metal transfer Hydraulic tilting; reducer alternative in the configuration note Selected mechanism and receiving-vessel arrangement
Capacity GW table based on nominal steel-density capacity Approved iron working mass and useful tapped quantity

Original related categories: electric furnaces, IGBT tilting induction melting furnaces, induction melting furnaces, metal melting furnaces and steel and iron melting furnaces.

Original induction furnace photograph on the iron melting crucible furnace page
Original HLQ product photograph.

Key Applications

  • Melting identified cast-iron charge for foundry use.
  • Remelting compatible iron returns under a defined charge-control procedure.
  • Preparing molten iron for transfer to a receiving ladle.
  • Coordinating repeated melting heats with downstream casting demand.

These are application scenarios, not documented customer installations. Grade suitability and final melt quality depend on the charge, containment system and process controls. The related cast iron induction melting page provides additional product context.

Iron melting induction furnace product photograph
Original HLQ product photograph.

Suitable Materials

Charge categories and material-specific checks
Charge category Source basis Required checks
Identified cast iron Named in the product description and energy table Composition, charge condition, target grade and containment compatibility
Compatible iron foundry returns Iron-scrap remelting application Material traceability, segregation, preparation and permitted charge dimensions
Steel and stainless steel Also listed in the description Separate grade, temperature and lining assessment; no separate steel energy column is supplied
Red copper, brass and aluminum Included in the source energy table Separate working-volume, containment and operating configuration

The listed metals do not validate one crucible or lining for every material. Establish compatibility and contamination requirements before changing metal campaigns. The zinc temperature entry below does not establish a validated zinc-melting configuration.

Working Principle

  1. The incoming supply is rectified to a DC link.
  2. An inverter delivers medium-frequency power to the matched coil and capacitor circuit.
  3. The coil produces an alternating magnetic field around the metal-containing vessel.
  4. Induced currents generate resistive heat in the conductive iron charge.
  5. The metal melts within the specified containment system and is checked before transfer.

The containment system must withstand the selected metal and operating conditions. Electromagnetic bath movement can assist circulation, but it does not certify chemistry or replace charge control.

Read the induction melting working principle and the related medium-frequency furnace power supply information. Separate power-supply ratings do not automatically extend the GW furnace specifications.

The principle illustration uses a generic refractory-lined vessel. It does not establish the exact containment construction of a supplied GW furnace.

Iron and steel induction melting equipment
Original HLQ product photograph.

Technical Specifications

All 12 GW model records are retained below. These are published reference entries, not independently verified results for a particular charge or installation.

GW Model Range

Nominal capacity, rated power, frequency and melting-time references
Model Nominal capacity (t), steel-density basis Rated power (kW) Frequency (kHz) Melting time (min)
GW-0.35T 0.35 250 1 20–45
GW-0.5T 0.5 350 0.8 30–50
GW-0.75T 0.75 500 0.8 40–50
GW-1T 1 800 0.7 40–50
GW-1.5T 1.5 1000 0.7 40–60
GW-2T 2 1400 0.5 45–60
GW-3T 3 2000 0.5 50–70
GW-5T 5 3000 0.3 50–80
GW-10T 10 6000 0.3 50–90
GW-15T 15 8000 0.3 50–90
GW-20T 20 10000 0.25 50–90
GW-30T 30 15000 0.25 50–90

Capacity clarification: The original prose states 0.15–20 t, whereas the listed GW models span 0.35–30 t. This table follows the actual model list. Nominal tonnage is not a verified useful iron tap quantity.

The source uses steel density stated as 7.8 and compares aluminum at 2.7. Its approximate furnace-volume comparison is not a substitute for approved working fill, lining thickness, freeboard or material-specific capacity.

Published melting-time entries span 20–90 minutes. Charging, quality checks, holding, tapping and turnaround must be included separately when evaluating total production time.

Electrical Data

Input supply frequency: 50/60 Hz. Slash-separated values preserve the first and second source entries in order; they are not continuous adjustment ranges.

Original input, rectifier, transformer and converter values
Model Incoming voltage (V) Incoming current (A) Rectifier pulses Transformer source entry (kVA) DC voltage (V) DC current (A) Medium-frequency voltage (V)
GW-0.35T 380 400 6 Three-phase; 315 500 500 750
GW-0.5T 380 560 6 Three-phase; 400 500 700 750
GW-0.75T 380 800 6 Three-phase; 630 500 1000 750
GW-1T 380 / 750 1280 / 656 6 / 6 Three-phase; 1000 / Three-phase; 1000 500 / 990 1600 / 808 750 / 1480
GW-1.5T 380 / 750 800 / 820 12 / 6 Double three-phase; 1250 / Three-phase; 1250 500 / 990 1000 / 1010 750 / 1480
GW-2T 750 / 750 1148 / 574 6 / 12 Three-phase; 1800 / Double three-phase; 1800 990 / 990 1414 / 707 1480 / 1480
GW-3T 750 820 12 Double three-phase; 2500 990 1010 1480
GW-5T 950 1140 12 Double three-phase; 4000 1260 1190 1900
GW-10T 950 2280 12 Double three-phase; 8000 1260 2380 1900
GW-15T 950 1520 24 Four three-phase; 10000 1260 1590 1900
GW-20T 950 1900 24 Four three-phase; 12500 1260 1980 1900
GW-30T 950 2850 24 Four three-phase; 20000 1260 2980 1900

GW-1T, GW-1.5T and GW-2T contain paired electrical entries. Confirm the matched arrangement against the approved electrical schedule. The source does not fully define the winding, branch or total-current basis of its multi-pulse configurations.

The three-phase, double three-phase and four three-phase transformer descriptions are preserved as source entries. Do not reinterpret them as a confirmed number of separate transformers or derive total demand by summing unspecified currents.

Material-Specific Energy References

Published energy entries, kWh/t
Model Cast iron Red copper Brass Aluminum
GW-0.35T 560 420 390 540
GW-0.5T 550 410 380 530
GW-0.75T 550 410 380 530
GW-1T 540 400 370 520
GW-1.5T 530 390 360 510
GW-2T 520 380 350 500
GW-3T 510 370 340 490
GW-5T 500 360 330 480
GW-10T 490 350 320 470
GW-15T 480 340 310 460
GW-20T 470 330 300 450
GW-30T 470 330 300 450

Cast-iron entries range from 470 to 560 kWh/t. The general 530 kWh/t statement does not describe every model. The source does not fully specify charge condition, useful output mass, metering boundary or holding allowance.

There is no separate steel or stainless-steel energy column. The listed nonferrous values do not validate melting all metals in the same containment system.

Original Temperature Entries

Source in-furnace temperature references
Material Source temperature (°C)
Steel 1650
Cast iron 1450
Red copper 1150
Brass 1000
Aluminum 700
Zinc 400

These entries are not universal melting points, maximum furnace ratings or pouring instructions. The cast-iron reference of 1450°C requires assessment against the actual grade and process.

Zinc: The source’s 400°C entry is retained for traceability and must not be used as a validated zinc-melting setpoint.

Additional Technical Conversions

Frequency in Hz equals published kHz multiplied by 1000. Cast-iron kWh/kg equals published kWh/t divided by 1000. These conversions add no new test results or performance guarantees.

Frequency and cast-iron energy unit conversions
Model Frequency (Hz) Published cast-iron energy converted to kWh/kg
GW-0.35T 1000 0.560
GW-0.5T 800 0.550
GW-0.75T 800 0.550
GW-1T 700 0.540
GW-1.5T 700 0.530
GW-2T 500 0.520
GW-3T 500 0.510
GW-5T 300 0.500
GW-10T 300 0.490
GW-15T 300 0.480
GW-20T 250 0.470
GW-30T 250 0.470

The 250–1000 Hz span describes the model series, not an established adjustment range for each furnace. Energy conversion does not resolve the missing test conditions.

Listed Construction and Control Features

  • Digital control, constant-power control and zero-voltage sweep-frequency starting.
  • Overcurrent, overvoltage, current-limiting, voltage-limiting and water-failure protection.
  • TU1 copper coil, high-silver brazed joints and insulation between turns.
  • Carbon-free hoses, 304 stainless-steel clamps, optical-fibre triggering and water-cooled thyristor components.
  • Horizontal capacitor construction with a magnesium-aluminum alloy outer enclosure described in the source.
  • Copper busbars, an isolation/changeover switch and a plate heat exchanger.
  • Furnace-cover and dust-extraction provisions.

The IGBT category label and the thyristor component description do not establish one converter topology for every configuration. Confirm the selected power unit and its load matching.

The claimed power factor of at least 0.96 is not thermal efficiency. The page does not establish a verified harmonic spectrum, a universal energy-saving percentage or installation-specific emissions compliance.

Hydraulic melting furnace product view
Original HLQ product photograph.

Recommended Model Selection

Initial model shortlist using the published nominal capacities
Nominal capacity group Models Selection focus
0.35–0.75 t GW-0.35T, GW-0.5T, GW-0.75T Required iron working mass, charge dimensions and approved containment
1–2 t GW-1T, GW-1.5T, GW-2T Paired electrical configurations and the complete heat cycle
3–5 t GW-3T, GW-5T Cooling, transformer arrangement and ladle-transfer coordination
10–30 t GW-10T, GW-15T, GW-20T, GW-30T Site utilities, charge handling, casting demand and maintenance access

These groups organize the source data. Final selection requires a defined grade, permitted working fill, useful tapped mass, temperature endpoint and production schedule. The largest nominal capacity is not automatically the best match for every casting operation.

For transfer-system context, see the hydraulic tilting induction furnace. Its configuration must be assessed separately.

Induction furnace equipment from the original product page
Original HLQ product photograph.

Process Workflow

  1. Identify iron charge: establish material traceability, grade compatibility and preparation requirements.
  2. Check containment and utilities: complete approved vessel or lining, cooling, electrical, extraction and tilting checks.
  3. Charge as specified: follow permitted charge condition, dimensions, loading sequence and working fill.
  4. Melt and monitor: operate within the approved power, temperature and protection limits.
  5. Check melt quality: perform the required temperature measurement, sampling and process checks.
  6. Tilt and transfer: coordinate receiving-vessel readiness and downstream casting demand.

This sequence describes process stages, not a substitute for the supplied operating procedure. Record the duration of each stage when evaluating production.

Hydraulic tilting furnace product photograph
Original HLQ product photograph.

Common Problems and Solutions

These observations suggest investigation paths. They do not establish a diagnosis or authorize changes to electrical, cooling or containment systems.

Iron melting observations and investigation steps
Observation Possible contributor Check
Long melting stage Charge geometry, working mass or power/load mismatch Compare actual charge and delivered power against the approved configuration
High measured kWh/t Extended holding, heat losses or inconsistent measurement boundaries Measure energy and useful output over the same defined period
Containment deterioration Material mismatch, thermal cycling or charging damage Follow approved inspection and service limits; confirm the containment specification
Composition outside target Mixed or incorrectly identified returns and additions Review charge traceability and the sampling procedure
Cooling or electrical alarm A monitored protection condition Resolve the cause under the fault procedure without bypassing interlocks
Transfer delays Mismatch between heat cycle, useful tap quantity and receiving capacity Coordinate furnace, ladle and casting schedules

Engineering Selection Guide

Required selection and acceptance information
Area Required information Purpose
Iron charge Grade, source, condition, dimensions and target composition Establish charge suitability and process requirements
Crucible or lining Confirmed material, construction, working fill, preparation, inspection and replacement limits Avoid assuming a removable pot or an unverified refractory recipe
Useful production Tapped mass, retained metal, endpoint and complete cycle Match actual output to casting demand
Electrical installation Supply, transformer arrangement, current basis and protection schedule Resolve paired and multi-pulse source entries
Supporting systems Equipment-specific cooling, extraction, tilting, access and foundation requirements Define the installation from approved drawings
Acceptance test Defined charge, containment condition, metered energy and useful output Compare measured results on a consistent basis

Coil and containment dimensions must be assessed together. Related induction heating coils provide component context, not a validated replacement specification for a GW furnace.

For a defined test, specific electrical energy equals metered kWh divided by useful tapped tonnes. Average useful output equals useful tapped tonnes divided by elapsed hours. State the included auxiliary loads and cycle stages, and account for changes in retained molten-metal inventory.

The layout illustration identifies charge staging, melting, ladle transfer, casting and supporting interfaces. It is not a construction drawing. No verified footprint, cooling flow, foundation load or clearance is supplied by the original page.

Medium-frequency iron and steel melting furnace product view
Original HLQ product photograph.

Advantages and Limitations

Relevant Advantages

  • Induction generates heat in the conductive metal charge.
  • The GW series offers several nominal-capacity, power and frequency combinations.
  • The source supplies a separate cast-iron energy reference column.
  • Listed controls and protection functions support monitored operation.
  • Tilting arrangements support controlled transfer to a receiving vessel.

Selection Limits

  • The page does not specify a crucible material, wall thickness or service life.
  • Each charge and alloy requires compatible containment and an approved process.
  • Nominal model capacity does not define useful iron output.
  • Published energy and melting-time entries require confirmed test conditions.
  • Cooling, containment condition and electrical maintenance remain essential.
  • Power factor and extraction provisions do not establish thermal efficiency or site compliance.

Why Choose HLQ?

HLQ publishes GW model data covering power, frequency, electrical arrangements and material-specific energy references. Its product description identifies the major equipment groups and states that non-standard power configurations can be designed.

The HLQ furnace engineering information describes selection and customization capabilities. For an iron melting crucible furnace, assess those capabilities against the actual grade, containment specification, useful tap quantity, complete cycle and site utilities.

Use approved configuration documents and defined acceptance conditions for final evaluation.

Another relevant equipment link retained from the original page is the induction furnace for melting iron and steel. Its specifications belong to that separate product page.

Iron and steel melting furnace original product photograph
Original HLQ product photograph.

6 Core FAQs

1. Does this product name confirm a removable graphite crucible?

No. The page does not identify a crucible material or removal method. It describes medium-frequency induction equipment and tilting arrangements. Confirm the supplied vessel or lining construction.

2. What capacity range is actually listed?

The GW table spans 0.35–30 t on a nominal steel-density basis. The separate 0.15–20 t statement is inconsistent. Confirm the approved working mass for the intended iron charge.

3. Can any iron scrap be charged?

The product’s iron-scrap application does not validate unknown mixed scrap. Charge identity, composition, condition, dimensions and compatibility must satisfy the approved process.

4. Which crucible or refractory material should be selected?

The source does not provide a material recipe. Selection requires the actual alloy, temperature endpoint, charge practice and equipment design. Do not infer a universal lining from the listed metals.

5. Is 530 kWh/t the energy figure for every model?

No. The published cast-iron column ranges from 470 to 560 kWh/t. Metering boundaries and operating conditions are incompletely specified, so the entries are references rather than universal guarantees.

6. Does the listed melting time determine hourly output?

No. Useful output depends on actual tapped mass and the full cycle, including charging, quality checks, holding, tapping and turnaround. The table alone does not establish hourly production.

=