Aluminium Smelter with induction
Aluminum Induction Smelter: Shift Production, Operating Cycle and Model Selection
Quick Answer. An aluminum induction smelter is an electrically powered metal melting furnace that melts metallic aluminium and aluminium alloys for casting and remelting. HLQ’s published SMJD series covers 150 kg to 1,200 kg of aluminium per heat at 60 kW to 200 kW, on a 3-phase 380 V, 50–60 Hz supply, with an oscillation frequency published from 1 kHz to 100 kHz (custom frequency available on request), a maximum furnace temperature of 1,800 °C and a 100 % load duration for 24 hours. Aluminium melts at 1220.66 °F (660 °C) and is worked in a published operating window of 680–760 °C. This page is about running the smelter: the published operating cycle of one heat, how many heats and how many tonnes fit into a shift, how the alloy is checked and corrected before the pour, and the maintenance and safety routine that keeps the shift running.
Quick Answer. Two points are worth stating first, because they are the ones most often misread. The word “smelter” here means secondary melting of metallic aluminium — it is not an electrolytic process for producing primary aluminium from alumina. And the published capacity is a charge per heat, not an hourly output: on the published melt-time reference, a 500 kg charge allows roughly 4 to 10 heats in an 8-hour shift, or 2.0 to 5.0 tonnes, before charging, skimming, alloy checking and pouring time are deducted. Both figures are reproduced in full below.

Table of Contents
- What is the Aluminum Induction Smelter?
- Key Applications
- Suitable Materials
- Working Principle
- Technical Specifications
- Recommended Model Selection
- Process Workflow
- Common Problems and Solutions
- Engineering Selection Guide
- Advantages and Limitations
- Why Choose HLQ?
- 6 Core FAQs
What is the Aluminum Induction Smelter?
An aluminum induction smelter is an electric furnace built around four things: a power supply that converts mains electricity into controlled-frequency alternating current, a water-cooled copper coil, a conductive crucible standing inside the coil, and the control system that keeps the melt on set point. The changing current in the coil produces a changing magnetic field; induced currents in the crucible wall produce the heat; the heat passes into the aluminium charge; and the same rotating field stirs the melt. There is no burner, no fuel line and no combustion exhaust at the furnace.
Two naming points, because the vocabulary on aluminium pages is inconsistent across the trade. First, “smelter” here means melting existing metallic aluminium — secondary production. It is not the electrolytic reduction of alumina, and no figure on this page describes such a process. Second, HLQ’s own published answer to the question “Which kind of power supply do you supply? Electricity or gas?” is a single word: Electricity. An “electric aluminum melting furnace” and an “induction aluminum melting furnace” are the same machine, and the same is true of the words oven, furnace and smelter. The wider terminology map is published on the aluminum melting oven page, and the product-level description of the machine on the aluminum melting furnace page.
The published SMJD family for this duty runs from the SMJD-463 to the SMJD-3100 in thirteen sizes. The furnace body holds the crucible, the induction coil and the refractory lining, and is available in a steel shell or an aluminium shell design, with hydraulic, gearbox or manual tilting for the pour. The published lining is an integral polycrystalline mullite fibre structure rated above 1,200 °C, and the published crucible options for aluminium are graphite, SiC-graphite and high-alumina.
This page covers the smelter as a production unit. For the specification-reading view — capacity class, derived power density and crucible geometry — see the aluminum smelting furnace page; for what “smelter” means in the product documentation, see the aluminum smelter with induction heating page.

Key Applications
A smelter is applied wherever a controlled, repeatable aluminium melt is required and the metal has to be delivered clean and at a controlled temperature into a ladle, a mould or an ingot line. The published duties and the class that covers each of them are set out below.
| Duty | Charge | Published capacity class | What decides the result |
|---|---|---|---|
| Foundry and ingot supply | Clean aluminium ingots, segregated production returns | 150–1,200 kg per heat (SMJD-463 to SMJD-3100) | Cycle time and pouring temperature |
| Alloy production | Sorted Al-Si, Al-Mg and Al-Cu ingots or segregated alloy returns | The same aluminium column | Alloy homogeneity and correction before the pour |
| Secondary recycling | Prepared, dry, sorted scrap; cans after sorting, cleaning and drying | Scrap, aluminium slag and pop can are named in the aluminium column | Charge preparation and dross control |
| Small batch and laboratory | 5–100 kg trials and pilot heats | DW-MF series, 3–75 kg of aluminium per heat | Batch size and alloy development |
The published aluminium material list for a smelter duty is short: aluminium ingots as the standard casting feedstock, aluminium cans as recycling material, aluminium profiles as extrusion scrap, aluminium chips as machining waste, and aluminium alloy scrap from wheels, engine parts and structural parts. Where the charge is a prepared recycling stream, the feed-side discipline is described on the aluminum scrap recycling furnace page; where the can itself is the feed, see the aluminum cans recycling furnace page. A full list of equipment around the furnace is published separately in the aluminum melting plant page.

Suitable Materials
Any electrically conductive metal can in principle be melted this way, but the charge form, the alloy and the contamination level decide whether a heat succeeds. The published suitability assessment for aluminium duty is reproduced below.
| Charge or material | Published suitability | Engineering note |
|---|---|---|
| Pure aluminium | Excellent | Easy to melt, good fluidity |
| Aluminium ingots | Excellent | Recommended feedstock; stable melting and predictable composition |
| Al-Si casting alloy | Excellent | Die casting, automotive and general casting |
| Al-Mg alloy | Good | Temperature control and fluxing to reduce oxidation and burning loss |
| Al-Cu alloy | Good | Temperature uniformity and alloy mixing for stable casting quality |
| Aluminium alloy scrap | Good | Must be sorted by alloy grade to avoid composition instability |
| Aluminium cans | Conditional | Thin with coatings; cleaning, drying and careful charging to reduce dross |
| Aluminium chips and turnings | Conditional | Must be dry and free from oil, water and cutting fluid; briquetting or pre-compaction improves yield and reduces oxidation |
| Zinc, tin and lead | Possible | Low melting point duty |
| Copper and brass | Possible with a different configuration | Separate crucible and lining specification |
One rule governs every row of that table: the charge must be dry. Moisture, sealed containers, oil and trapped liquid can cause dangerous explosions when charged into molten aluminium, and sealed cavities in scrap must be opened before charging. Where the batch is small and the alloy is still being developed, the induction melting aluminum small-batch range is the published starting point.

Working Principle
The heating sequence published in the manufacturer’s manual is: the rectifier filter circuit converts AC to DC; the control circuit converts DC into high-frequency magnetic energy; the changing current in the coil produces a changing magnetic field; the field lines pass through the crucible; induced currents circulate in the crucible wall; the crucible itself is heated; and the heat is then transferred to the aluminium alloy.
Three engineering consequences follow from that sequence, and each one shapes the smelter’s operating routine. Because the vessel is the heating element, the crucible and lining are production-critical and appear in the shift maintenance routine. Because the same rotating field heats the crucible, it also stirs the melt, which is why the published remedy for an uneven alloy composition is stirring plus correct charge order rather than a mechanical stirrer. And because the melt is stirred and held by the power supply rather than by a flame, the temperature is a controlled variable: PID heating control, an LED digital controller accurate to up to 3 °C, digital phase-locked-loop frequency tracking with automatic load impedance matching, and closed-loop power control that stops the temperature moving when the load changes as the charge melts.

Technical Specifications
All values in this section are taken from HLQ’s published parameter sheet, manufacturer manual and product tables. Figures that have been computed from published numbers are marked derived and are not published ratings.
| Parameter | Published value |
|---|---|
| Model series | SMJD, 13 models (SMJD-463 to SMJD-3100) |
| Output power (parameter sheet) / listed power (product table) | 60 kW – 200 kW |
| Input current | 90 A – 300 A |
| Input voltage | 3-phase 380 V, 50–60 Hz |
| Oscillation frequency | 1 kHz – 100 kHz, custom frequency according to customer request |
| Maximum furnace temperature | 1,800 °C |
| Aluminium melting capacity | 150 kg – 1,200 kg per heat (aluminium, aluminium alloy, aluminium scrap, aluminium slag, pop can) |
| Copper, gold, silver (scrap, slag) capacity | 500 kg – 3,000 kg per heat |
| Steel and stainless steel capacity | 150 kg – 1,200 kg per heat |
| Aluminium melting point | 1220.66 °F (660 °C) |
| Aluminium operating range | 680 – 760 °C |
| Furnace lining | Integral polycrystalline mullite fibre, rated above 1,200 °C |
| Crucible / lining for aluminium | Graphite, SiC-graphite or high-alumina |
| Temperature control | PID heating control, LED digital controller, accuracy up to 3 °C |
| Power devices | IGBT |
| Load duration | 100 %, 24 hours continuous operation |
| Stirring | Electromagnetic — the melt is mixed by the field |
| Pour method | Hydraulic, gearbox or manual tilt into a ladle or moulds |
| Cooling | Closed-loop cooling tower or industrial chiller for coil, power supply, capacitors and cables |
| Temperature measurement | Thermocouple, immersion probe or infrared pyrometer |
| Control level | Manual, digital, PLC or HMI |
| Control functions | Automatic load matching, digital non-relay control, PLC interface, HMI interface, temperature feedback, alarm protection |
| Protection package | Over-voltage, under-voltage, phase loss, over-current, over-heat, real-time parameter display, fault diagnosis and alarm, leakage automatic alarm with automatic power cut-off, water pressure protection |
| Warranty | 12 months from the date the contract is signed |
| Storage conditions | −20 °C to 60 °C, 0–95 % relative humidity, no dew, no corrosive gases or liquids |
Published melting capacity table
| Type | Input power | Steel, stainless steel | Copper, gold, silver (scrap, slag) | Aluminium, aluminium alloy, aluminium scrap, aluminium slag, pop can | Max temperature |
|---|---|---|---|---|---|
| SMJD-463 | 60 kW | 200 kg | 500 kg | 200 kg | 1,800 °C |
| SMJD-480 | 60 kW | 150 kg | 500 kg | 150 kg | 1,800 °C |
| SMJD-580 | 80 kW | 200 kg | 600 kg | 200 kg | 1,800 °C |
| SMJD-600 | 60 kW | 230 kg | 560 kg | 230 kg | 1,800 °C |
| SMJD-900 | 120 kW | 300 kg | 900 kg | 300 kg | 1,800 °C |
| SMJD-905 | 80 kW | 300 kg | 900 kg | 300 kg | 1,800 °C |
| SMJD-1250 | 80 kW | 400 kg | 1,200 kg | 400 kg | 1,800 °C |
| SMJD-1250 | 120 kW | 450 kg | 1,350 kg | 450 kg | 1,800 °C |
| SMJD-1500 | 120 kW | 500 kg | 1,500 kg | 500 kg | 1,800 °C |
| SMJD-1550 | 120 kW | 520 kg | 1,560 kg | 520 kg | 1,800 °C |
| SMJD-1700 | 160 kW | 600 kg | 1,700 kg | 600 kg | 1,800 °C |
| SMJD-2300 | 160 kW | 800 kg | 2,000 kg | 800 kg | 1,800 °C |
| SMJD-3100 | 200 kW | 1,200 kg | 3,000 kg | 1,200 kg | 1,800 °C |
The steel column and the aluminium column are identical in every row; the middle column is a combined copper/gold/silver (scrap, slag) figure and must not be read as an aluminium capacity. The SMJD-1250 appears twice because one vessel is published with two power ratings — the 80 kW version at 400 kg and the 120 kW version at 450 kg. The maximum temperature of 1,800 °C is a furnace rating, not an aluminium melting temperature: aluminium melts at 660 °C and is worked at 680–760 °C.
Published energy reference
| Metal | Typical power consumption reference | Engineering note |
|---|---|---|
| Aluminium | Approximately 500–780 kWh/T | Oxidation, dross and holding time should be controlled carefully |
| Steel | Approximately 560–900 kWh/T | Higher melting temperature and charge condition strongly affect consumption |
| Cast iron | Approximately 550–850 kWh/T | Common foundry duty; good lining improves efficiency |
| Copper | Approximately 310–500 kWh/T | Lower melting temperature but high conductivity requires good matching |
The theoretical heat content to bring aluminium to 720 °C is published at approximately 0.30 kWh/kg. The difference between that floor and the practical reference is the melting loss, the holding loss and the plant overheads — which is why a smelter’s energy bill is dominated by how long the metal is held, not only by how fast it melts.
Published power density by duty (kW per tonne)
| Duty | Published power density |
|---|---|
| Rapid batch ingot charge | 450–600 kW/t |
| Standard mixed charge | 350–450 kW/t |
| Scrap remelting | 300–400 kW/t |
| Continuous casting supply | 250–350 kW/t |
| Holding | 100–200 kW/t |

Recommended Model Selection
Start from the published capacity ladder. It is the reference that connects a charge weight to a power rating and a melt time, and it is the only published basis for estimating how much a smelter can produce in a shift.
| Furnace capacity | Recommended power | Approximate melting time per batch | Typical application |
|---|---|---|---|
| 50 kg | 30–80 kW | 20–60 min | Lab, small casting |
| 100 kg | 60–120 kW | 30–70 min | Small foundry |
| 250 kg | 120–250 kW | 40–90 min | Medium casting |
| 500 kg | 250–500 kW | 45–100 min | Industrial foundry |
| 1,000 kg | 500–1,000 kW | 60–120 min | Large production |
| 2,000 kg | 1,000–1,600 kW | 90–150 min | Heavy foundry |
| 3,000 kg | 1,500–2,500 kW | 100–180 min | High-capacity melting |
The table below applies that published reference to the published SMJD aluminium capacities. The heats and tonnes columns are derived: 480 minutes of an 8-hour shift divided by the published melt time for the nearest published capacity row, multiplied by the published charge. They count melting time only — charging, skimming, alloy checking and pouring are not included, so a real shift output is lower. The energy column uses the published aluminium reference of 500–780 kWh/T.
| Model | Aluminium capacity per heat | Listed power | Derived heats per 8 h shift | Derived tonnes per 8 h shift | Derived electricity per shift |
|---|---|---|---|---|---|
| SMJD-480 | 150 kg | 60 kW | 6 – 16 | 0.90 – 2.40 | 450 – 1,872 kWh |
| SMJD-463 | 200 kg | 60 kW | 5 – 12 | 1.00 – 2.40 | 500 – 1,872 kWh |
| SMJD-580 | 200 kg | 80 kW | 5 – 12 | 1.00 – 2.40 | 500 – 1,872 kWh |
| SMJD-600 | 230 kg | 60 kW | 5 – 12 | 1.15 – 2.76 | 575 – 2,153 kWh |
| SMJD-900 | 300 kg | 120 kW | 5 – 12 | 1.50 – 3.60 | 750 – 2,808 kWh |
| SMJD-905 | 300 kg | 80 kW | 5 – 12 | 1.50 – 3.60 | 750 – 2,808 kWh |
| SMJD-1250 | 400 kg | 80 kW | 4 – 10 | 1.60 – 4.00 | 800 – 3,120 kWh |
| SMJD-1250 | 450 kg | 120 kW | 4 – 10 | 1.80 – 4.50 | 900 – 3,510 kWh |
| SMJD-1500 | 500 kg | 120 kW | 4 – 10 | 2.00 – 5.00 | 1,000 – 3,900 kWh |
| SMJD-1550 | 520 kg | 120 kW | 4 – 10 | 2.08 – 5.20 | 1,040 – 4,056 kWh |
| SMJD-1700 | 600 kg | 160 kW | 4 – 10 | 2.40 – 6.00 | 1,200 – 4,680 kWh |
| SMJD-2300 | 800 kg | 160 kW | 4 – 8 | 3.20 – 6.40 | 1,600 – 4,992 kWh |
| SMJD-3100 | 1,200 kg | 200 kW | 4 – 8 | 4.80 – 9.60 | 2,400 – 7,488 kWh |
Read the table as a campaign tool rather than a catalogue. A bigger vessel raises the tonnes per shift but lowers the number of heats per shift, because each heat takes longer. Where the gap between heats matters, the published answer is a dual-output power supply in which one supply serves two furnace bodies alternately, so the second body can be charged and melting while the first is being poured.
One inconsistency has to be stated openly: the ladder above gives 500–1,000 kW for a 1,000 kg aluminium batch, while the published SMJD ratings for the 800 kg and 1,200 kg models are 160 kW and 200 kW. Both figures are reproduced here as published. For a specific duty, the required power and the melt time must be confirmed with the manufacturer before the model is fixed.

Process Workflow
The published operating sequence for one heat is reproduced below. It is the smelter’s shift routine: the pre-shift checks, the charge, the controlled ramp, the temperature and composition check, the pour, and the return to the next charge.
| Step | Operation |
|---|---|
| 1 | Check the power supply, cooling water and hydraulic system |
| 2 | Inspect the furnace lining and crucible |
| 3 | Load the metal charge into the crucible |
| 4 | Start the cooling system |
| 5 | Start the induction power supply |
| 6 | Increase the power gradually |
| 7 | Melt the metal and remove slag if needed |
| 8 | Measure the molten metal temperature |
| 9 | Adjust the alloy composition if required |
| 10 | Tilt the furnace hydraulically and pour the molten metal |
| 11 | Return the furnace to the upright position |
| 12 | Prepare for the next melting batch |
Step 6 deserves emphasis. Increasing the power gradually is what protects the crucible and the lining from thermal shock, and it is the reason a smelter ramp is a controlled operation rather than a switch-on. Step 9 is where the alloy is held on grade: the published recommendation is to check the composition and add the required master alloy if needed, and the published remedy for an uneven composition is the electromagnetic stirring that the field provides together with correct charge order. Step 7 is where dross is removed, with a steel ladle, before the pour rather than after it.
The pouring end of the sequence is supported by a published feature set: smooth tilting that reduces splashing and improves pouring accuracy, an adjustable angle for different moulds or ladles, strong load capacity for heavy furnace bodies and molten metal, an emergency return for abnormal conditions, and operator-controlled pouring. Where the pour feeds a continuous line rather than a ladle, the plant-level arrangement is published separately on the hydraulic tilting induction furnace page.


Common Problems and Solutions
The first table reproduces the published troubleshooting guidance. In a smelter the expensive faults are the ones that stop a shift, and most of them start as a charge or a check that was skipped.
| Problem | Likely cause | Published solution |
|---|---|---|
| Violent eruption when charging | Wet, oily or sealed scrap | Charge only clean, dry material and remove sealed cavities |
| Melting slower than expected | Power too low for the batch, or poor charge packing | Check power against the capacity table and improve charge density; PID heating control and closed-loop power control hold the set point |
| Dross and burning loss with aluminium | Thin, dirty or coated scrap; high temperature | Clean and dry the charge, control the temperature and use flux; skim the residue with a steel ladle |
| Alloy composition uneven across the melt | Charge not stirred, or charge order wrong | Electromagnetic stirring mixes the alloy and evens out the temperature; control power and time at the melt step and charge order at the charging step |
| Temperature drift across the melt | Load changes as the charge melts and more metal is added | PID heating control for uniform heating temperature and prevention of molten aluminium temperature drift, with an LED digital controller of up to 3 °C accuracy |
| Power fluctuation as the load changes | Impedance changes from a cold solid charge to a full bath | Digital phase-locked-loop frequency tracking with automatic load impedance matching, plus closed-loop power control |
| Short lining life | Wrong lining chemistry for the metal or the slag | Choose the lining to suit the metal; the SMJD furnace is published with an integral polycrystalline mullite fibre lining rated above 1,200 °C |
| Coil overheating | Insufficient cooling, scale blockage or pump failure | Check the cooling tower or chiller, the water quality and the filters |
| Water alarm or trip | Low flow or pressure, or blocked circuits | Check the cooling plant and the filters; the published protection package includes over-heat and leakage alarms with automatic power cut-off |
| Molten aluminium contamination | Mixed scrap, dirty charge, wrong flux or a damaged crucible | Sort the charge by alloy, keep it dry, use the correct flux and inspect the vessel |
The second table is the published maintenance routine. It belongs on the shift, not in a cupboard: each item is a check that prevents one of the faults above.
| Maintenance item | Published recommended action |
|---|---|
| Induction coil | Check insulation and water leakage |
| Cooling system | Remove scale and maintain water quality |
| Hydraulic cylinder | Check oil level, seals and pressure |
| Furnace lining | Inspect cracks, erosion and wear |
| Power cabinet | Clean dust and check electrical connections |
| Temperature sensor | Calibrate regularly |
| Tilting frame | Check bolts, bearings and alignment |

Engineering Selection Guide
Ten factors decide whether a smelter is the right machine for a duty, and each of them has a published recommendation.
| Selection factor | What to confirm | Published recommendation |
|---|---|---|
| Metal type | Aluminium, aluminium alloy, or another metal | Select lining chemistry and power density by metal |
| Batch capacity | Kilograms per heat | Allow a practical loading and pouring margin |
| Target melting time | Minutes per batch | Higher power shortens melting but needs a larger supply |
| Daily production | Tons per shift or per day | Decide on one furnace, several furnaces or a dual-output power supply |
| Power supply | Plant voltage, transformer capacity, cable size | Confirm electrical capacity before ordering |
| Tilting | Manual, mechanical or hydraulic | Hydraulic for medium and large furnaces |
| Cooling | Water flow, pressure, temperature and quality | Closed-loop cooling tower or industrial chiller |
| Layout | Charging area, crane, ladle path, mould area | Plan the layout before fixing the furnace dimensions |
| Crucible and lining | Metal to be melted and its temperature | Graphite, SiC-graphite or high-alumina for aluminium duty |
| Charge condition | Clean, dry, sorted, or dirty, wet or mixed | Reject wet, oily and sealed material before it reaches the crucible |
Published process requirements
| Requirement | Published recommendation |
|---|---|
| Temperature control | Avoid overheating |
| Fume control | Use ventilation and dust and fume collection |
| Melting speed | Fast melting reduces metal loss |
| Flux use | Use a suitable flux if required |
| Pouring | Smooth hydraulic tilting reduces oxidation |
| Alloy correction | Check the composition and add the required master alloy if needed |
Published cooling options
| Cooling method | Application |
|---|---|
| Open water cooling | Simple system, lower initial cost |
| Closed-loop cooling tower | Better water quality and stable cooling |
| Industrial chiller | Suitable for precise temperature control |
| Soft water circulation | Protects the coil and the power electronics from scaling |
The layout below is a concept, not a certified drawing. The three things that decide whether a smelter bay works are the crane capacity, the tilting envelope of the furnace with the ladle in it, and the cooling capacity of the water plant — and all three have to be fixed before the furnace dimensions are fixed.

Advantages and Limitations
Advantages
| Feature | Engineering meaning |
|---|---|
| Heat generated inside the charge | No burner, no fuel, no combustion exhaust and no chimney at the smelter |
| Electromagnetic stirring | The melt is mixed by the field, so alloy composition and temperature are more even across the bath |
| Closed-loop control | PLL frequency tracking, automatic load impedance matching, closed-loop power control and PID heating control with an LED controller accurate to 3 °C |
| Working environment | No combustion exhaust in the workshop and no radiant heat from a burner; the published energy-saving claim is 20–40 % against a diesel workshop furnace and 20–30 % against gas and oil furnaces |
| 100 % load duration | 24 hours of continuous operation at full load, which is what makes a shift campaign possible |
| Low maintenance on the heat source | No resistance element or burner to oxidise in service; the coil is insulated, water-cooled and protected |
| Controlled pour | Hydraulic tilting with an adjustable angle, strong load capacity and an emergency return |
| Compact and installable | Small footprint, straightforward installation and repair |
| Self-protection | Over-voltage, under-voltage, phase loss, over-current, over-heat, water pressure and leakage alarms with automatic power cut-off on leakage |
Limitations
| Limitation | Reason | Recommended solution |
|---|---|---|
| Charge capacity is per heat | The published table is a vessel charge figure; cycle time depends on the charge, the power and the pour | Build the shift plan from the published melt-time reference and confirm it for the real duty |
| Capacity and power do not scale together | The 150 kg and 200 kg models carry the same 60 kW rating, so power density varies across the range | Select on power density and cycle time, not on capacity alone |
| Dry charge is mandatory | Moisture, sealed containers, oil and trapped liquid can cause explosions in molten aluminium | Dry and sort the charge, remove sealed cavities, never charge wet material |
| Dross and oxidation loss on scrap duty | Thin, coated or dirty charge oxidises as it melts | Sort, clean, dry and compact the charge; control the temperature and skim the dross |
| Cooling water is a hard utility requirement | The coil, cables, capacitors and power supply are water-cooled | Install a closed-loop cooling tower or industrial chiller with flow and pressure monitoring |
| Crucible and lining are consumables | The crucible is the heating element and the vessel at the same time | Inspect the lining after each shift and keep the published lining chemistry for the metal |
| Melting power cannot be taken from the grid | A 200 kW class smelter is a large electrical load | Confirm transformer capacity, cable size and the incoming supply before the order |
| Holding time costs energy | The published practical reference of 500–780 kWh/T sits far above the 0.30 kWh/kg theoretical heat | Plan the pour around the pour schedule and minimise holding at temperature |

Why Choose HLQ?
HLQ Induction Heating Equipment is an induction heating manufacturer based in Dongguan, Guangdong, with a branch in Quanzhou, Fujian, and 25 years of R&D and production in high-frequency and medium-frequency induction heating equipment. For a smelter duty the relevant points are the ones that affect the machine that actually arrives.
- The data is published before the order. The capacity table, the electrical parameters and the crucible dimensions are published as a parameter sheet, so the vessel that receives the metal can be checked against the charge in advance.
- Both ends of the size range are covered. The DW-MF small series runs from 3 kg to 75 kg of aluminium per heat, and the SMJD production series from 150 kg to 1,200 kg, on the same electrical and control architecture.
- 24-hour duty is the published design point, not an option: 100 % load duration for 24 hours of continuous operation.
- The control and protection package is standard. PLL tracking, automatic load impedance matching, closed-loop power control, PID heating control to a 3 °C LED controller, and a protection set covering over-voltage, under-voltage, phase loss, over-current, over-heat and leakage with automatic cut-off.
- The machine is prepared before it leaves. The published procedure is that the machine is test-run by technical staff before shipment, with photographic and video QC records available on request under a QC team working to TQM, and that engineers are sent for installation, debugging and training until the machine is in normal production.
- The commercial terms are stated in writing. Warranty is 12 months from the date the contract is signed. Packing is film for waterproofing, a paper box, a wooden exporting case and foam for shock protection. Shipping is free to the buyer’s shipper in China or direct to any main port of China. Storage is −20 °C to 60 °C, 0–95 % relative humidity with no dew and no corrosive gases or liquids.
Related HLQ products published on the same equipment pages: the Aluminum Melting Furnace, the Aluminum Smelter For Sale, the Stationary gold melting furnace induction, the Copper Scrap Melting Furnace and the Electric Aluminum Melting Furnace. Manufacturer information is published at dw-inductionheater.com.
6 Core FAQs
1. What does “aluminum smelter” mean on this page?
It means an electric furnace for melting or remelting metallic aluminium and aluminium-alloy charge before casting. It does not mean the electrolytic production of primary aluminium from alumina, and no figure published here describes that process. The equipment is induction melting equipment in every case, and HLQ’s own published answer to the question “Which kind of power supply do you supply? Electricity or gas?” is a single word: Electricity.
2. How many heats can an aluminium smelter run in one shift?
On the published melt-time reference, an 8-hour shift of 480 minutes holds between 4 and 10 heats for a 500 kg charge (45–100 min per batch) and between 4 and 8 heats for a 1,000 kg charge (60–120 min per batch). That converts to roughly 2.0–5.0 tonnes and 4.0–8.0 tonnes per shift respectively, and to about 1,000–3,900 kWh and 2,000–6,240 kWh of electricity at the published 500–780 kWh/T aluminium reference. These are derived figures that count melting time only: charging, skimming, alloy checking and pouring are not included, so a real shift output is lower, and the figures must be confirmed against the actual charge.
3. Which model suits a 500 kg per heat aluminium duty?
The published aluminium column offers the SMJD-1500 at 500 kg / 120 kW and the SMJD-1550 at 520 kg / 120 kW, and both sit in a pair with the 450 kg SMJD-1250 at 120 kW. The published capacity ladder, however, gives 250–500 kW for a 500 kg batch, which does not reconcile with the 120 kW rating printed for those models. This is a published inconsistency in the source documents and it is stated here rather than hidden. If the cycle time is the priority, the 120 kW models give more heats per shift; if the capital cost is the priority, the ladder’s power range should be confirmed against the real charge before the order.
4. What temperature does aluminium melt at, and what is 1,800 °C?
Aluminium melts at 1220.66 °F (660 °C) and the published operating range for the smelter is 680–760 °C. The 1,800 °C figure in the capacity table is the maximum furnace temperature of the equipment, not a melting temperature — it is the ceiling of the lining and the vessel rating, and it is the reason the same furnace body can also be listed against steel, copper, gold and silver capacities in the same table.
5. How much electricity does a shift of melting take, and can it be saved?
The published practical reference for aluminium is 500–780 kWh per tonne, against a theoretical heat content of approximately 0.30 kWh/kg to bring the metal to 720 °C; the gap is melting loss, holding loss and plant overhead. On the saving side the published product claim is 20–40 % compared with a diesel workshop furnace, while the manufacturer manual quotes 20–30 % compared with gas and oil furnaces. The two published figures are quoted here with their baselines because no common measurement basis exists between them.
6. How is the alloy held on grade through a shift?
With the published operating practice rather than with an additional machine. The charge is sorted by alloy grade and kept dry; the melt is stirred electromagnetically, which is what evens out both temperature and composition; the temperature is held by PID control with an LED controller accurate to up to 3 °C; the composition is checked before the pour and corrected with master alloy if needed; and the dross is skimmed with a steel ladle before the pour rather than after it. Where the published pour method is hydraulic tilting, the published benefit is a smoother transfer with less oxidation. What the published data does not establish is a measured recovery rate for any particular feed, so scrap and can duties should be treated as requiring their own acceptance basis.
Further published documentation: the SMJD induction melting furnace parameter sheet, the Aluminum, Copper, Iron Induction Melting Furnace manual, and the Aluminium Scraps Recycling Melting Process note for the charge-side view of a recycling duty.